Divel d.o.o. Sarajevo - civil engineering services - design, revision, supervision

SUPERVISION

From the very beginning, all engineers employed by the company have been active participants in the construction of the Motorway at Corridor Vc at Sections: Kakanj – Visoko, length 16 km; Visoko – Podlugovi, length 8.5 km; Podlugovi – Jošanica, length 11.5 km; Sarajevo bypass Lot 1 Jošanica – Butila and Interchange Butila 5 km long; as well as at Zenica bypass, Section Drivuša - Klopče.

Supervision services were also provided during: construction and reconstruction of other BH roads in the total length of over 850 km; construction, reconstruction and rehabilitation of 29 bridges and 6 tunnels; rehabilitation of landslides at 35 locations; construction of Southern Longitudinal Road and XII Transversal Road in Sarajevo – public junction point - Interchange Stup with access to the city expressway through Sarajevo.

  • Ongoing consulting services for the supervision of Motorway construction on Corridor Vc, Section Poprikuše – Zenica North, Subsection Vranduk - Ponirak. Complete professional expert and geodetic supervision (all phases) over construction of the Motorway on Corridor Vc. Alignment length l=5.309,30 m
    • Section Length : right carriageway l=4.839,30 m, left carriageway l=4.769,30 m
    • Tunnel “Vranduk”, left tunnel tube l=432 m, right tunnel tube l=312 m
    • two Bridges: “Vranduk 1” and “Vranduk 2”; left carriageway l=720 m, right carriageway l=730 m
    • five Viaducts “Crni Potok”, “Koprivna 1”, “Vijadukt 1”, “Vijadukt 2”, and “Vijadukt 3”; left carriageway l=370,22 m , right carriageway l=825,78 m
    • Cut&Structure, l=113,90 m
  • Consulting services for supervision of Construction of Motorway on Corridor Vc, section Donja Gračanica – Drivuša, subsection Drivuša – Klopče
    Complete professional and geodetic supervision (all phases), on Corridor Vc, section Donja Gračanica – Drivuša, subsection Klopče – Drivuša, 2.5 km long with two bridges.
  • Supervision over construction of Motorway at Corridor Vc, section Donja Gračanica – Drivuša, subsection Klopče – Drivuša (consortium with Taep Kuwait).
  • Supervision over construction of Motorway Zenica – Sarajevo, section Kakanj – Visoko, section I Kakanj – Dobrinje, length 8,6 km (consortium with Institute of Transportation, Faculty of Civil-Engineering Sarajevo and IPSA Institute Sarajevo).
  • Supervision over construction of Sarajevo Bypass, Lot 1 Jošanica – Butila and Interchange Butila, length 5,0 km (consortium with DDC Ljubljana and Institute of Transportation Sarajevo).
  • Supervision over construction of Motorway Zenica – Sarajevo, section Kakanj – Visoko, section II Dobrinje – Visoko, length 7,9 km (consortium with Institute of Transportation of Civil Engineering Faculty Sarajevo and IPSA Institute Sarajevo).
  • Supervision over construction of Motorway Zenica – Sarajevo, section Visoko – Podlugovi, length 8.5 km (consortium with Institute of Transportation of Civil Engineering Faculty Sarajevo).
  • Supervision over construction of Motorway Zenica – Sarajevo, section Podlugovi – Jošanica, length 11.5 km (consortium with Institute of Transportation of Civil Engineering Faculty Sarajevo).
  • Supervision of the Modernization of Main Roads in the FBiH which includes the construction of slow vehicle lanes at nine locations, reconstruction and rehabilitation of three tunnels and seven bridges, reconstruction and rehabilitation of the roadway with correction of the road axis at three locations, reconstruction of eight blackspots locations, reconstruction of intersections with addressing blackspots at four locations, and reconstruction of the intersection with road axis correction at one location.
    • M17 Topčić Polje - Lašva (Vranduk II) Tunnel
    • M17 Bridge over the River Bosna, Bosna IV
    • M18 Bridge over the River Ljubina
    • M5 Bridge over the River Sana, Ključ
    • M5 Bridge over the River Pliva, Jajce
    • M5 Bridge Komar, over deep ravine
    • M16.4 Bridge over the River Vrbas, Bugojno
    • M17 Bridge over the River Bregava, Tasovčići
    • M17 Tarčin - Konjic km 16+800 - km 17+600, Black Spots
    • M17 Mostar Centre - Gnojnice Mostar South, km 1+640, Black Spots
    • M17 Tasovčići – Čapljina Roundabout, M6 i M17 km 0+000, Black Spots
    • M20 Ustikolina – Goražde 8, Roundabout Vitkovići, road repair and alignment correction
    • M5 Jajce South – Donji Vakuf 1 road repair and alignment correction
    • M 5 Ripač – Dubovsko, construction of slow vehicle lane
    • M 6.1 Posušje - Grude - Široki Brijeg, construction of slow vehicle lane
    • M19.2 Vitalj – Vlasenica (Entity Border), road repair and alignment correction
    • M18 Vitalj - Olovo "Nula" km 20+600, Black Spots
    • M1.8 Pelagićevo - Srebrenik (Ormanica) Tunnel
    • M18 Šićki Brod 3 - Živinice1 Roundabout "Husino" km 2+500, Black Spots
    • M15 Borova glava + Trivunove krivine L=2,3+2,4+1,6 L=1,0 km, construction of slow vehicle lanes
    • M17 Konjic - Jablanica 1 (Crnaja) Tunnel
    • M5 Kobiljača, construction of slow vehicle lane
    • M5 Bihać 4 – Ripač, road repair and alignment correction
    • M14.2 Drvar – Resanovci, construction of slow vehicle lane
  • Supervision over works execution on reconstruction of Main Roads, reconstruction of crossroads, construction of new crossroads, construction of underpasses and reconstruction of bridges at 18 locations – consortium with IPSA Institute Sarajevo and IG Institute Ltd. Banja Luka.
  • Supervision over works execution on reconstruction of the Main Road M-18 Šićki Brod – Sarajevo, section Podpaklenik – Olovo.
  • Supervision over works execution on rehabilitation of the Main Roads in BH, Lot 1, Contract BA/RRFBH/S/QCBS/02-1/07 (sections of the Main Roads in Unsko – Sanski Canton, in total length of 157,00 km) – consortium with Integra Ltd. Mostar and Trasa Ltd. Sarajevo.
  • Supervision over works execution rehabilitation of the Main Roads in BH, Lot 3, Contract BA/RRFBH/S/QCBS/02-3/07 (sections of the Main Roads in Sarajevo Canton, Hercegovačko neretvanski Canton and Zeničko – Dobojski Canton, in total length of 257,00 km) – consortium with Integra Ltd. Mostar and Trasa Ltd. Sarajevo.
  • Supervision over works execution on rehabilitation of the Main Roads in BH, Lot 4, Contract BA/RRFBH/S/QCBS/02-4/07 (sections of the Main Roads in Srednje-bosanski Canton, Zapadno Hercegovački Canton and Livanjski Canton, in total length of 197,00 km) – consortium with Integra Ltd. Mostar and Trasa Ltd. Sarajevo.
  • Supervision over works execution on urgent reconstruction of the Road M-17 Sarajevo – Jablanica, length 77 km.
  • Supervision over works execution on reconstruction of the Main Road M 17 and construction of gallery, route stretch “Prenjska vrata”.
  • Supervision over works execution on urgent rehabilitation of the Main Road M 17, Sarajevo – Mostar, section Tarčin – Podorašac, section length 22 km.
  • Supervision over works execution on construction of the XII Transversal Road (two separate roadways) and two sections of the Southern Longitudinal Road (four-lane City Road). Consortium with Integra Mostar and ZIL Ljubljana.
  • Supervision over works execution on
    • Rehabilitation of the bridge over Ujića Rijeka in Kladanj, Road M-18,
    • Rehabilitation of the bridge over stream Dubokovac in Velika Brijesnica, Road M-4,
    • Rehabilitation of retaining structures at the Road M-19.2, section Kladanj – Vlasenica.
  • Supervision over works execution on rehabilitation of the bridge at M-17, section Doboj - Lašva km 58+869 over the River Bosna, Topčić Polje.
  • Supervision over works execution on rehabilitation of the bridge at M-18, km 108+400 over the River Bosna, railway and Main Road M-5 at Jošanica Interchange.
  • Supervision over works execution on construction of tunnel “Kladušnica” and “Bjelava” at M-18 Šićki Brod – Sarajevo, section Podpaklenik – Olovo.
  • Supervision over works execution on construction of tunnel “Stupčanica” and two bridges at M-18 Šićki Brod – Sarajevo, section Podpaklenik – Olovo.
  • Supervision over construction of the bridge over the Jablaničko Lake, at the Road R-418b, section Ćelebići – Lisičići.
  • Supervision over reconstruction of the two bridges over the River Ljubina at the Main Road M-18, section Šićki Brod – Sarajevo, km 98+538 and km 105+640.
  • Supervision over reconstruction of the bridge over the River Rača and Local Road at the Main Road M-18, section Šićki Brod – Sarajevo in Srednje.
  • Supervision over works execution on rehabilitation of the Tunnel “Kupreška vrata” at the Main Road M-16, section Bugojno – Kupres.
  • Supervision over works execution on rehabilitation of the Tunnel “Crnaja” at the Main Road M-17, section Konjic – Jablanica.
  • Supervision over works execution on reconstruction of the bridge “Lučki” over the River Neretva in Mostar (consortium with Integra Ltd. Mostar).
  • Supervision over construction of the bridge over the River Bosna in Doboj – South, Local Road stretch Mravići – Ševarlije.
  • Supervision over works execution on rehabilitation of the landslide at the Road M-18, section: 005 Priboj 2 – Simin Han 1, six locations along Banj brdo.
  • Supervision over works execution rehabilitation of the landslide at the Road M-17, section: 007 Topčić polje – Lašva, two locations.
  • Supervision over works execution on rehabilitation of the landslide at the Road M-15, section: 004 Kamičak – Ključ, four locations.
  • Supervision over works on rehabilitation of landslide “Trčivode” at the Main Road M-5 section: Sarajevo Bypass.
  • Supervision over works execution on rehabilitation of landslide “Stanovi 1” at the Main Road M-18, near Kladanj.