Divel developed the Main Designs for both motorways and expressways to the length of 109.6 km, which included designs for 74 bridges with a total length of 12,100 m, as well as the designs for nine tunnels with a total tube length of over 24 km, among which are the Crni Vrh Tunnel 2,200.00 m, the Suhodol Tunnel (November 25th ) 2,930 m, the Vijenac Tunnel (March 1st) 2,970 m, to name but a few. Furthermore, the designs were also developed for 6,800 m of retaining and cladding structures, as well as for 70 other structures (underpasses, overpasses, interchanges, hydrotechnical facilities, etc.), including the traffic design of the A1 Motorway (Kakanj - Jošanica).

The company is also heavily involved in projects for the construction, modernisation, reconstruction and rehabilitation of motorways and regional roads, as well as a number of associated bridges (66 structures), tunnels (15 tunnels and galleries) and rehabilitation of landslides and rockfalls. The company has also completed traffic designs for over 850km of F BH Motorways.

Allow us to point out the main design of the 37 km long Neum-Stoc Main Road, linking Neum to the hinterland of Bosnia and Herzegovina, as well as the reconstruction and rehabilitation projects of roads over 830 km long. As for the network of motorways and regional roads, 66 bridges, 16 tunnels and galleries have been designed. Among the large-scale and complex structures we worked on, we are especially proud of the design of the bridge over the Jablanica Lake (550 m long) and the bridge on the Čemerno Pass (400 m long).

The projects related to stabilization, reconstruction and improvement of the level of service of the existing tunnels are undoubtedly very complex and demanding projects by any standard. When it comes to tunnel construction, Divel has worked on and completed many tunnel designs, among which the most significant are undoubtedly the "Vranduk 2" Tunnel on the M-17 Road (section Doboj – Lašva), the Karaula Tunnel on the M18 Road (section Kladanj-Olovo), the "Crnaja" Tunnel on the M-17 Road, (section Sarajevo– Jablanica), Ormanica Tunnel on the M18 Road (section Orašje-Tuzla), the Čaklovići Tunnel on the M4 Road (section Tuzla-Kalesija), the Karaula Tunnel on the M17 Road (section Ozimica-Topčić Polje), the Skela Tunnel (section Jajce-Donji Vakuf).

  • The Main Design for Nević Polje - Turbe, the Expressway Lašva - Travnik - Jajce, L=12.5 km is in progress. (Main Design: Alignment, Main Design: Local and Service Roads, Geotechnical, Geophysical, Hydrogeological and Engineering-Geological Explorations, Main Design: Engineering Structures, Main Design: External Drainage, Design: Traffic – Technical Equipment of the Motorway).
    • The Main Design for two tunnels.
    • The Main Design for seven bridges.
  • Development of the Preliminary Design of the Expressway Lašva-Nević Polje-Jajce on the Section Nević Polje-Travnik-Turbe-Jajce South (junction with the Main Road) L=42.9 km.
    • Preliminary Tunnel Design: 11 tunnels, among which the T-6 Tunnel (l=5150 m)stands out,
    • Preliminary Design: Alignment, including External Drainage,
    • Preliminary Design: Interchange (Interchange Turbe and Interchange Jajce South),
    • Preliminary Design: Local Roads,
    • Preliminary Design: Landfills and Borrow Pits,
    • Preliminary Design: Traffic Areas, Level Crossings ,
    • Geotechnical investigation works/surveys for the Preliminary Design stage,
    • Documentation of completed investigation works/surveys,
    • Hydrogeological investigation works/surveys with hydrogeological mapping,
    • Study on EG and geotechnical characteristics of soil with data on geomechanical, geotechnical and geoseismic properties of soil and rocks,
    • Preliminary Design: Internal Drainage,
    • Preliminary Design: Viaducts and Bridges,
    • Preliminary Design: Overpasses and Underpasses,
    • Preliminary Design: Retaining Structures
  • Main Design: Motorway at Corridor Vc, Section Medakovo – Ozimica, length 21,10 km – (Main Design: Alignment, Main Design: Local and Service Roads, Geotechnical, Geophysical, Hydrogeological and Engineering-Geological Explorations, Main Design: Engineering Structures, Main Design: External Drainage, Design: Traffic – Technical Equipment of the Motorway).
  • Executive Design: Alignment Section Medakovo-Ozimica
  • Executive Design: Other Roads, Bridge 1, right structure (L=267.20m), left structure(L=199.75m)
  • Bridge 3, right structure (L=381,40m), left structure(L=381,40m),
  • Bridge 4, right structure (L=226.95m), left structure(L=213.45m
  • Bridge 6 right structure(L=112.40m): left structure(L=113.40m)
  • Executive Design: Crni Vrh Tunnel, twin-tubed: Right Tunnel Tube L=2200.00m (km 0+550.00-2+750.00). Right Tunnel Tube L=2217.70 m (km 0+532.15-2+749.67).
  • Development of the Preliminary Design of the expressway Lašva-Nević Polje-Jajce on the section Nević Polje-Travnik-Turbe-Jajce South (junction with the Main Road) L=42.9 km.
  • Main Design: Motorway at Corridor Vc, section Počitelj – Zvirovići, length 10,9 km – (Main Design: Route, Main Design: Relocation of Main and Service Roads, Geomechanics, Geotechnical, Geophysical, Hydrogeological and Engineering-Geological Explorations, Main Design: Engineering Structures, Main Design: External Drainage, Design: Traffic – Technical Equipment of the Motorway).
  • Analysis / Revision of Preliminary Design: Motorway at the Corridor Vc; section: Konjic – Jablanica – Mostar North. Optimization of the Preliminary Design for the section in question including compilation of Geological, Geomechanical and Geodetic Maps for modified sections, as well as compilation of Preliminary Design: Route and Structures situated along modified sections.
  • Updated Traffic Design at the Motorway A1, section Kakanj – Jošanica.
  • Main Design: Motorway Zenica – Sarajevo – Mostar, section Tarčin – Bradina; length 10,2 km – (survey maps, Main Design: Route, Design: Roadway Structure, Main Design: Service Roads, geomechanical, geotechnical, geophysical, hydrogeological and engineering-geological explorations, Main Design: Engineering Structures, Main Design: Drainage, Design: Traffic – Technical Equipment of the Motorway, Main Design: Installations / Buried Services, Architectural/Engineering Design: Service and Accompanying Facilities, Noise Protection Design, Expropriation Study, Design: Relocation of Installations / Buried Services).
  • Main Design: Expressway Lašva – Donji Vakuf section Lašva – Interchange Nević Polje, length L=23,66 km - (survey maps, geology/geo-mechanic maps, preliminary design of the section Lašva – Kaonik, Main Design: Route section Lašva – Kaonik, Design: Roadway Structure, Main Design: Service Roads, Main Design: Engineering Structures, Main Design: Drainage, Design: Traffic – Technical Equipment of the Motorway).
  • Main Design: Motorway Zenica – Sarajevo – Mostar, section Lepenica – Tarčin; length 10,15 km – (survey maps, Main Design: Route, Design: Roadway Structure, Main Design: Service Roads, Main Design: Engineering Structures, Main Design: Drainage, Design: Traffic – Technical Equipment of the Motorway, Noise Protection Design, Expropriation Study, Design: Relocation of Installations / Buried Services).
  • Main Design: Completion of Motorway Zenica – Sarajevo, section Drivuša – Kakanj; subsection Bilješevo (Lučani) – Kakanj, length 9,00 km – (geodetic data, Main Design: Reconstruction of Existing Traffic Lane and Extension of New Lane, Design: Roadway Structure, Main Design: Regional Roads R-445, Main Design: Service Roads, Main Design: Engineering Structures, Main Design: Drainage, Design: Traffic – Technical Equipment of the Motorway, geological – geomechanical explorations, Expropriation Study, Design: Relocation of Installations / Buried Services).
  • Main Design: Completion of Motorway Zenica – Sarajevo, section Kakanj – Visoko, length 16.5 km – (geodetic data, Main Design: Reconstruction of Existing Traffic Lane and Extension of New Lane, Main Design: Interchange Kakanj, Design: Roadway Structure, Main Design: Service Roads, Main Design: Engineering Structures, Main Design: Drainage, Design: Traffic – Technical Equipment of the Motorway, geological – geomechanical explorations, Expropriation Study, Design: Relocation of Installations / Buried Services, Environmental Impact Study, Design: Environmental Protection Structures).
  • Main Design: Expressway M-4 Lukavac – Tuzla, section Tuzla (Drežnik) – Šićki Brod, length 5.0 km and Main Design: Interchange at Šićki Brod, intersection of Main Roads M-4, M 18 and M-1.8. – consortium Divel Ltd. and IPSA Institut Sarajevo.
  • Main Design: Completion of Motorway Zenica – Sarajevo, section Visoko – Podlugovi, length 8.5 km: geodetic data, Main Design: Reconstruction of Existing Traffic Lane and Extension of New Lane, Main Design: Service Roads, geological – geomechanical explorations and Expropriation Study.
  • Main Design: Reconstruction, 1st Stage Motorway Zenica – Sarajevo, section Podlugovi – Jošanica, length 11.5 km.
  • Main Road M18 Tuzla-Sarajevo, Main Design: Alignment and Structures, Subsection 2 km 5+400-km 11+250 (Bypass Živinice)
  • Main Design: the reconstruction/rehabilitation of the facilities on the Lašva Interchange (3 facilities)
  • Updated Design: Safety Crash Barriers at the Main Road M17 from Tarčin to Potok, L=82,6 km
  • Updated Traffic Design: Safety Crash Barriers at the Roads in Canton Sarajevo, L=90 km
  • Asphalt Road Rehabilitation Design on the M14.2, Section: Srbljani-Bosanska Krupa, km 5+700 – km 15+700
  • Main Design: Protection of Roads Against Falling Material From Embankments and Avalanches Rehabilitation of Embankments, on the M14.2, Section: Srbljani-Bosanska Krupa,
  • km 0+000 – km 20+000 (18 location)
  • Main Design: Reconstruction of the Intersection in Velika Brijesnica on the M4 Road, Section Doboj-Tuzla
  • Main Design: Reconstruction of the Intersection in Mala Lisa on the M4.2 Road, Section Velika Kladuša-Srbljani,
  • Main Design: Reconstruction and Rehabilitation of M-19.2 Road, Section 001:Vitalj-Vlasenica,km 6+850.00 - km 11+670.00
  • Main Design: Reconstruction of the Intersection M-18 i M-5 leading to the Roundabout, M18 010 km 2+200 (entrance to Vogošća)
  • Reconstruction of the Intersection leading to the Roundabout at the Main Road M17, exit to Hadžići
  • Updated Traffic Design: Road M18, Section Entity Border – Bogatići – Trnovo – Entity Border, L=6 km; M14.2 Bos. Petrovac – Drvar – Bos. Grahovo – R Croatia Border (Strmica), L=78 km; M 11 Ripač-Užljebić (R Croatia Border), L=8,6 km; M 14.1 Entity Border -Gradačac- Entity Border, L=12 km; M15 Entity Border (Mlinište)-Glamoč-Priluka, L=52,5 km; M17 Jošanička Interchange – Stupska Interchange, M 5 Sarajevo City Bypass, L=18,5 km
  • Updated Traffic Design: Main Roads
  • M5 Section 018 Podgrab (Entity Border ) - Prača - Hrenovica (Entity Border ), L=14 km;
  • M6.1 Section 005 Priluka – Livno L=9 km;
  • M17 Section 007 Zenica - Petlja Lašva,L=15 km;
  • M14.Section 006, Section 007 Brod (Entity Border ) – Svilaj - Vukosavlje (Entity Border ),L=25 km; M16.5 Section 001 Karlov Han – Kazaginac,L=14 km
  • Updated Main Design: Cazin Interchange Route, including Environmental Impact Study. Main Design of modified 1,7 km of Route and three crossroads.
  • Main Design: three sections at Main Roads:
    • Road M-5, section Gromiljak – Blažuj, subsection Han Ploča – Šamin Gaj (Kobiljača) – reconstruction,
    • Road M-6, Northern Grude Bypass (connection M6 and R420) L=2,7 km – new construction,
    • Road M-5, Kiseljak Bypass, L=2,0 km – new construction.
  • Main Design: Main Road M-17.3, Buna – Stolac – Neum, section Broćanac – Drenovac, subsection Cerovica – Drenovac, length 10,0 km.
  • Main Design: Main Road M-17.3, Buna – Stolac – Neum, section Broćanac – Drenovac, subsection Broćanac – Hutovo – Cerovica, length 14,0 km.
  • Updated Traffic Designs: Main Roads: Road M-18, section Kladanj – Olovo – Vogošća (66 km); Road M-15, section Livno – Šujica – Kolo (42 km); Road M-16, section Livno - Podgradina – Kamensko (33 km).
  • Design: Rehabilitation of Main Road: M-5.1 section: Kaonik - Bukovići, L=15 km.
  • Design: Rehabilitation of Main Road: M-16 section: Donji Vakuf – Bugojno, L=15 km; M 5 section: Jajce – Donji Vakuf, L=20 km.
  • Design: Rehabilitation of Main Road: M-5 section: Bosanski Petrovac – Gornje Bravsko – Velagići, L=40,1 km.
  • Updated Traffic Designs: Main Roads: Road M-6, section Gorica (border) – Grude – Ljubuški – Čapljina – Stolac – entity border and Road M-20, section entity border – Ustikolina – Goražde – entity border.
  • Design: Rehabilitation of Main Road: M-5 sections: Jošanica – Stup, Šeherćehajin Most – Korija, Praća – Hrenovica; M-18 sections: Jošanica – Sarajevo and Stup – entity border.
  • Design: Main Road Rehabilitation: M-4.2 sections: Grahovo – Skokovi and Skokovi – Cazin.
  • Explorations and Main Design: Bypass Olovo at Road M-18, section Šićki Brod – Sarajevo, length 5,0 km.
  • Design: Rehabilitation of Main Road: M-5 passage through Bihać; M-14 Bosanska Krupa – Ljusina and M-15 entity border – Sanski Most.
  • Design: Rehabilitation of Main Road: M-17 sections Stup – Blažuj and Hadžići – Tarčin and M 18 section Bogatići – Trnovo.
  • Traffic Design: Main Road M-5 section border crossing Izačić – Bihać and M-14 section Bihać – Srbljani – border crossing Velika Kladuša.
  • Main Design: Rehabilitation of Main Road:
    • M-17, section Konjic – Ostrožac, L=7,63 km,
    • M-17, section Ostrožac – Jablanica, L=11,79 km,
    • M-16.2, section Varvara (Prozor) – Jablanica, L=22,1 km.
  • Reconstruction of Regional Road R-401, section Radića most – Bužim.
  • Traffic Design: Main Road M-17 sections: Stup Interchange – Jablanica, Jablanica – Mostar and Mostar – Doljani (border with R Croatia).
  • Main Design: Main Road M-5 Izačić – Bihać – Orljani, section Bakšaiško Polje – Orljani length 7,625 km.
  • Main Design: Main Road M-17.3 section Kiševo – Broćanac length 9.8 km and Preliminary Design: Main Road M-17.3 section Broćanac – Drenovac length approx. 25 km.
  • Main Design: Main Road M-18 Šićki Brod – Sarajevo, section Kladanj – Podpaklenik length 10.70 km (including geological explorations, hydrological and other explorations, preliminary works and Preliminary designs for structures).
  • Main Design: Main Road M-18 Šićki Brod – Sarajevo, section Podpaklenik – Olovo length 8.00 km (including geological explorations, hydrological and other explorations, preliminary works and Preliminary designs for structures).
  • Main Design: Urgent Rehabilitation of the Main Road M-17, section Jablanica - Doljani, length 96 km .
  • Preliminary Design: Expressway trough Sarajevo – Interchange Velešići
  • Preliminary Design: Interchanges and Junction Roads,
    • Main Design: Horizontal and Vertical Traffic Signalling in the Centar Sarajevo Municipality,
    • Executive Road Design: IX Transversal Road Sarajevo, Section: from Džemala Bijedića St. to junction with the Roundabout,
    • Road Design: IX Transversal Road (Roundabout – junction of IX Transversal Road with Safeta Zajke and Smaje Šikala Sts.),
  • Updated Design of Traffic Signalization at roadway network of Ilidža Municipality, Sarajevo.
  • Preliminary and Main Design of City Motorway, Sarajevo, section: Ciglane – Pofalići; Pofalići Interchange Design.
  • Preliminary and Main Design of City Road with 4 traffic lanes and two crossroads at the entrance to Kakanj .
  • Main Design: Motorway at Corridor Vc, Section Medakovo – Ozimica, length 21,10 km – (Main Design: four bridges and tunnels):
    • Bridge 1, right structure(L=267.20m), left structure (L=199.75m),
    • Bridge 3, right structure(L=381,40m), left structure (L=381,40m),
    • Bridge 4, right structure(L=226.95m), left structure (L=213.45m),
    • Bridge 6 right structure(L=112.40m): left structure (L=113.40m),
  • Executive Design: Crni Vrh Tunnel, twin-tubed:
    • Right Tunnel Tube L=2200.00m (km 0+550.00-2+750.00).
    • Right Tunnel Tube L=2217.70 m (km 0+532.15-2+749.67).
  • Main Design: Motorway at Corridor Vc, section Počitelj – Zvirovići, length 10,9 km – Main Design: three bridges and two-tube tunnels, length 1200 m.
  • Main Design: Motorways Zenica – Sarajevo – Mostar, section Tarčin – Konjic, Lot 1; length 10,2 km – Main Design: six bridges and viaducts (dual structures), four two-tube tunnels, four underpasses, and 1.700 m of retaining and protective structures.
    • Bridge 1. – Raštelica 1, L=517+518 m,
    • Bridge 2. – Raštelica 2, L=610+591 m,
    • Bridge 3. – Bradina 1, L=338+380 m,
    • Bridge 4. – Bradina 2, L=237+213 m,
    • Bridge 5. – Zukići 1, L=260+218 m,
    • Bridge 6. – Zukići 2, L=288+209 m,
    • Tunnel 1. – Ivan, L=1.770+1.720 m,
    • Tunnel 2. – Kraljevac, L=1.060+1.050 m,
    • Tunnel 3. – Zukići 1, L=430+420 m,
    • Tunnel 4. – Zukići 2, L=490+430 m.
  • Main Design: Expressway Lašva – Donji Vakuf section Lašva – Interchange Nević Polje, length L=23,66 km – Main Design: three bridges (dual structures), two two-tube tunnels, five bridges and one tunnel at Lašva Interchange, two underpasses and 2.800 m of retaining and protective structures.
  • Construction Design: Route at Briješće Interchange, part of Sarajevo Bypass; Construction Design: Briješće Viaduct.
  • Main Design: Motorway Zenica – Sarajevo – Mostar, section Lepenica - Tarčin; length 9,58 km – Main Design: three bridges, four two-tube tunnels, three structures for regulation of watercourse, overpass, three underpasses, retaining and protective structures.
    • Bridge M-1, L=2*180,0 m (left and right structure),
    • Bridge M-2, L=200 m (left and right structure),
    • Bridge M-3, L=2*92,0 m (left and right structure),
    • Tunnel Zakunjača, L=312,0+370,0 m,
    • Tunnel Grabosječ, L=833,0+888,0 m,
    • Tunnel Suhodol , L=2.929,0 m (dvije cijevi),
    • Tunnel Tarčin, L=437,0+381,0 m,
    • Three structures: watercourse regulation, total length 600 m,
    • Overpass L=60,0 m,
    • Retaining and Protective Structures L=2.300,0 m.
  • Main Design: Completion of Motorway Zenica – Sarajevo, section Drivuša – Kakanj, subsection Drivuša – Bilješevo (Lučani), length 10,00 km. Explorations and Main Design: Bridge; Main Design: Tunnel “Vijenac”:
    • Bridges M-2, L=342,0 m (left and right),
    • Bridges M-3, L=496,5 m right and L=380,4 m left structure,
    • Tunnel „Vijenac“, L=3.000,0 m.
  • Main Design: Completion of Motorway Zenica – Sarajevo, section Drivuša – Kakanj, subsection Bilješevo (Lučani) – Kakanj, length 9,00 km.
    • Explorations and Main Design: Extension, Reconstruction and Reinforcement (better bearing capacity) of Three Existing Bridges:
      • Bridge over Repovački potok, L=18,0 m,
      • Bridge over the River Bosna, L=112,5 m,
      • Bridge over the River Bosna, L=197,2 m,
    • Explorations and Main Design: Three New Bridges:
      • Bridge over Repovački potok, L=18,0 m,
      • Bridge over the River Bosna, L=112,5 m,
      • Bridge over the River Bosna, L=215,8 m.
    • Explorations and Main Design: 10 Motorway underpasses for pedestrian, local and regional traffic.
  • Main Design: Completion of Motorway Zenica – Sarajevo, section Kakanj – Visoko, length 16.5 km.
    • Explorations and Main Design: Extension, Reconstruction and Reinforcement (better bearing capacity) of twelve existing bridges:
      • Interchange Kakanj, L=50 m,
      • Two bridges over the River Bosna, L=130 m,
      • Overpass – Regional Road Visoko – Kakanj, L=30 m,
      • Two bridges over River Bosna tributaries, L=28 m,
      • Six structures – Motorway underpasses for Local Roads,
    • Explorations and Main Design: sixteen new bridges:
      • Two bridges over the River Bosna (prestressed concrete), L=130 m,
      • Overpass: Regional Road Visoko – Kakanj (reinforced concrete), L=34 m,
      • Two bridges over River Bosna tributaries (prestressed concrete), L=28 m,
      • Nine structures – Motorway underpasses for Local Roads (reinforced concrete),
      • Walkway (steel), L=40 m,
      • Motorway Overpass for local traffic (reinforced concrete), L=110 m.
  • Main Design: Completion of Motorway Zenica – Sarajevo, section Visoko - Podlugovi, length 8.5 km.
    • Explorations and Main Design: Extension, Reconstruction and Reinforcement (better bearing capacity) of three existing bridges:
      • Interchange Visoko L=118 m (prednapregnuti i armirano – betonski),
      • Overpass - Railway Sarajevo – Vrhpolje L=101 m (reconstruction of prestressed structure),
      • Bridge over the River Bosna, Regional Road and Railway Sarajevo – Vrhpolje, “Čekrčići”, L=230 m (prestressed),
    • Explorations and Main Design: three new bridges and two underpasses:
      • Interchange Visoko L=120 m (prestressed and reinforced concrete),
      • Overpass- Railway Sarajevo – Vrhpolje L=132 m (prestressed),
      • Bridge over the River Bosna, Regional Road and Railway Sarajevo – Vrhpolje, “Čekrčići”, L=264 m (prestressed).
  • Main Design Reconstruction and Reinforcement (better bearing capacity) of eight prestressed bridges in total length of 1500 m, 1st stage of Motorway Zenica – Sarajevo, section Podlugovi – Jošanica.
  • Reconstruction of the M-5 Road, Skela Section; the “Skela “ Tunnel and the cca 1 km of road on the M-5, Section Jajce South - Donji Vakuf
  • Reconstruction of the Tunnel Karaula at M17, Section: Ozimica-Topčić Polje
  • Main Design: 7 bridges:
    • Rehabilitation of bridge (M16.2-001-280) over the River Bunta, location Gračanica, Bugojno 2 – Gornji Vakuf, km 8+152,
    • Demolition of existing bridge and construction of new bridge over stream Bravnice in Bravnice (M5-009-508), section: Jajce South - Donji Vakuf 1, km 3+746,
    • Demolition of existing bridge and construction of new bridge over stream Jezernica in Turalići (M19.2-001-101), section Kladanj – Vlasenica, km 9+809,
    • Reconstruction of bridge over dry bed in Stanovi (M18- 007-86), section Živinice 1 – Vitalj, km 25+886,
    • Demolition of existing bridge and construction of new bridge over Crna Rijeka in Bašci (M18.1-001-446), section Ustikolina – Trnovo, km 42+720,
    • Reconstruction of bridge over the River Ljubina in Semizovac (M18- 010-398), section Semizovac – Sarajevo – Malta, km 0+048,
    • Reconstruction of bridge over the River Stupčanica in Olovske Luke (M18-008-165), section Vitalj – Olovo, km 20+443.
  • Main Design: Rehabilitation of Tunnel “Crnaja” (L=552 m) at M-17, section Konjic – Jablanica.
  • Main Design: Rehabilitation of Tunnel “Ćaklovići” at M-4, section Simin Han – Donje Ceparde, km 2+775.
  • Main Design: Rehabilitation of Tunnel “Ormanica” (T1.8-003-1) L=250 m, at M-1.8, section Pelagićevo – Srebrenik.
  • Main Design: Rehabilitation of Bridge over the River Bregava at M-17, section Mostar – Čapljina – border with R Croatia.
  • Explorations and Main Design: four bridges at the Main Road M-18, section Kladanj – Podpaklenik, subsection Karaula mountain pass.
  • Explorations and Main Design: Tunnel “Karaula” at M-18, section Kladanj – Podpaklenik, subsection Karaula mountain pass.
  • Main Design: Walkway over the Main Road M 1.8, section Orašje – Šićki Brod, part of Šićki Brod Interchange.
  • Explorations and Main Design: Tunnel “Oštrovac” L=190 m at M-17.3 Stolac – Neum, section Kiševo – Broćanac.
  • Explorations and Main Design: Reconstruction of Tunnel “Vranduk 2”, length 1.060,0 m at M 17 section Doboj – Lašva.
  • Explorations and Main Design: Rehabilitation of Bridge over the River Bosna at M-17, section Doboj – Lašva, at km 63+795 (Bosna IV).
  • Explorations and Main Design: Tunnel “Mušići” L=200,0 m at M-5 Izaćić – Bihać, section Izaćić – Kamenica.
  • Explorations and Main Design: six bridges (M-1 L=231,0 m; M-2 L=120,0 m; M 3 L=111,0 m; M-4 L=225,0 m; M-7 L=20,0 m; and M-8 L=140,0 m) at M-5 Izaćić – Bihać, section Izaćić – Kamenica.
  • Explorations, Preliminary Design and Main Design: Structures at the Main Road M-5 Donji Vakuf – Lašva, section III Selišta – Mali Mošunj, subsection III-2: Vitez – Divjak:
    • Structure at Interchange Vitez L=60 m,
    • Four bridges L=10 m,
    • Underpass
    • Two overpasses L=60 m.
  • Preliminary and Main Design: Structures at Bugojno Bypass, at Main Road M-16.4 Novi Travnik – Bugojno:
    • Bridge over the River Vrbas L=47,6 m, composite structure,
    • Bridge over regulated riverbed of the River Vrbas (reinforced concrete) L=40,0 m,
  • Geological – geomechanical explorations, Hydrological and Geodetic Maps, Main Design: three tunnels at the Main Road M-18, section Podpaklenik – Olovo.
    • Tunnel Bjelava L=80,0 m,
    • Tunnel Kladušnica L=96,0 m,
    • Tunnel Stupčanica L=120,0 m.
  • Explorations and Main Design: rehabilitation of five composite bridges (L=30,00 m) over the River Ljubina, at the Main Road M-18, section Šićki Brod – Sarajevo.
  • Explorations and Main Design: reconstruction of four tunnels near Jajce, at the Main Road M-16.0-2 Banja Luka – Jajce.
  • Explorations and Main Design: three composite bridges (L1=180,00 m, L2=150,00 m, L2=300,00 m, at the Regional Road R-445 Visoko – Kakanj as a part of relocation of the Regional Road due to construction of Motorway Zenica – Sarajevo, section Kakanj – Visoko.
  • Explorations and Main Design: rehabilitation of RC bridge over the River Una in Bihać, at the Main Road M-5, city bridge, km 13+344.
  • Explorations and Main Design: rehabilitation of RC bridge over the River Rača and of Local Road in Srednje, Main Road M-18 Šićki Brod – Sarajevo at km 91+084, L=88.6 m.
  • Explorations and Main Design: rehabilitation of bridge over the River Drinjača in Kladanj, Main Road M-18 Šićki Brod – Sarajevo at km 44+033, L=46.55.
  • Explorations and Main Design: rehabilitation of RC viaduct at the Main Road M-18 Šićki Brod – Sarajevo at km 41+514, L=67,15 m.
  • Explorations, Preliminary and Main Design: rehabilitation of Tunnel “Crnaja”, length 550 m at the Main Road M-17, section Sarajevo – Jablanica.
  • Explorations, Preliminary and Main Design: rehabilitation of Tunnel “Kupreška vrata”, length 350 m, at the Main Road M-16, section Bugojno – Kupres.
  • Geodetic maps, geo-explorations, Preliminary and Main Design: of the bridge over the River Idbašica, Main Road M-17 in Ćelebići L=36 m (prestressed), Preliminary (composite and suspended) and Main Design: bridge (composite) over the Jablaničko Lake, in Ćelebići at the Regional Road 418b, L=544 m.
  • Preliminary and Main Design: galleries at the Main Road M-17 Jablanica – Mostar, section “Prenjska vrata”, L=44 m.
  • Main Design: Pedestrian bridge over the River Una in Bihać.
  • Preliminary Design: Viaduct “Velešići” situated at city Motorway in Sarajevo – prestressed structure L=522,71 m.
  • Preliminary and Main Design: Rehabilitation of two composite bridges over the River Bosna located at four-lane city road at exit from Kakanj and bridge over the River Zgošće.
  • Main Design and Geological – Geotechnical Explorations on rehabilitation of the side slope at three locations along the Main Road M-15, section Kamičak – Ključ.
  • Main Design: and Geological – Geotechnical Explorations on rehabilitation of two landslides along the Main Road M-17, section Topčić Polje - Lašva.
  • Main Design and Geological – Geotechnical Explorations on rehabilitation of six landslides along the Main Road M-18, section Priboj 2 – Simin Han.
  • Main Design and Geological – Geotechnical Explorations on rehabilitation of retaining structures along the Main Road M-19.2, section Kladanj – Vlasenica and Main Design: Rehabilitation of the bridge over Ujića rijeka at the Main Road M-18 in Kladanj.
  • Explorations and Main Design: Landslides:
    • Landslide “Trčivode” at M-05, Sarajevo Bypass,
    • Landslide at km 56+500, road M-18,
    • Landslide at km 34+500 to 35+050, road M-18.
  • Main Design: Rehabilitation of bends – “black spots” at the Main Road M-14, section Bihać – Bosanska Krupa and M-5, section Izačić – Bihać at km 1+880 and at km 2+660.